FSC® SGSHK-COC-370674CE 0407-CPR-2146 · EN 13986Chi Linh, Hai Phong, Vietnam
[email protected]
PK PLYConstruction plywood
PK PLY
Send specification
[email protected]

Chi Linh, Hai Phong, Vietnam

FOB Hai Phong · CFR · CIF

Buyer FAQ · from our film-faced lines

Vietnam plywood sourcing FAQ: answers from our mills

In short

Every answer here comes from PK Ply's own production and paperwork at our two mills in Chi Linh, Hai Phong. Our MUF film-faced panels give about 12–15 pours and phenolic up to about 25, with release agent and sealed edges. The minimum order is one 40HC, shipped FOB Hai Phong, CFR or CIF.

  • Pours and conditions
  • Waterproofing
  • MUF or phenolic
  • MOQ and payment
  • Anti-slip tests
  • Transit
  • Certificate files
Vietnam plywood sourcing FAQ: water beading on the dark brown film at the corner of a film-faced panel
Water beads on the dark brown film at the corner of a film-faced panel; veneers and amber paint along the edge.
pours, MUF, about, with handling
12–15
pours, phenolic, up to about
25
minimum order
1×40HC
at sea to Northern Europe
30–40 days

Film

Buyer questions, answered in one film

The film answers the questions buyers ask most, each with the panel, the test or the document that backs the answer.

What to ask a plywood mill · 1:52, English captions

The short answers

Vietnam plywood sourcing FAQ in one table

The seven questions buyers ask first, each answered in one line. The sections below give the detail and the evidence.

Short answers to the first buyer questions
QuestionShort answer
How many pours?MUF about 12–15, phenolic up to about 25, with handling, release agent and sealed edges
Is it waterproof?The film and a phenolic bond resist water; bare edges do not, so every cut is sealed
MUF or phenolic?Phenolic for many pours, MUF for standard jobs
MOQ and payment?One 40HC; 30% deposit, 70% against the scanned B/L
Delivery terms?FOB Hai Phong, CFR or CIF
Days to Northern Europe?About 30–40 days at sea
Certificate files?Sent before the order is confirmed

Pours and water

How many pours can our film-faced plywood give, and under which site conditions?

About 12–15 pours with MUF glue and up to about 25 with phenolic glue. Both counts assume proper handling, a release agent on every pour and sealed edges, including every cut edge.

Pour counts are targets for a build and a site routine. Rough stripping with a steel bar, skipped release agent or an unsealed cut shortens any panel; budget formwork panels typically give about 4–10 reuses.

Is film-faced plywood waterproof? The film sheds water and our phenolic bond holds through boiling: SGS Vietnam passed our 21 mm phenolic specimen at EN 314 bonding Class 3 after 72 h boiling. Water still enters through bare end grain, which is why all four edges leave the mill painted.

MUF glue is water-resistant and costs less; phenolic is a WBP bond that gives more pours. Choose phenolic when the panels will really be reused many times.

Steel A-frame rack holding film-faced and anti-slip plywood sheets
A rack of film-faced and anti-slip sheets: the faces buyers ask about most.

Anti-slip

Which anti-slip patterns do we make, and what did the pendulum tests show?

We press rice, hexagon and wire-mesh patterns into the film. SGS pendulum-tested two of our anti-slip specimens under DIN EN 16165 Annex C with slider 96; the results below belong to those specimens, and we claim no slip class.

SGS pendulum results on two anti-slip specimens
SpecimenDryWet
200 × 145 × 18.38 mm5840
200 × 150 × 14.62 mm6053

Terms and transit

What MOQ, payment and delivery terms apply to an order from our mills?

One 40HC minimum. Production takes 15–45 days after a 30% deposit; the 70% balance is paid against the scanned B/L by T/T or irrevocable L/C at sight. We ship FOB Hai Phong, CFR or CIF.

From Hai Phong a container takes about 30–40 days at sea to Northern Europe, 25–35 days to the Mediterranean and 20–30 days to the US West Coast. The carrier and route set the final figure.

Our two mills ship up to 150 containers a month, so repeat monthly loads are planned against the same technical sheet.

Certificate files

Which certificate files do we send before an order is confirmed?

The files for the build you are buying, before you confirm. Shipping documents follow in draft after loading.

  • CE factory production control

    Certificate 0407-CPR-2146 under EN 13986, for structural orders in the 3.6–30 mm scope.

  • FSC® chain of custody

    SGSHK-COC-370674; the claim is confirmed per order on the sales documents.

  • SGS test reports

    Bonding, density and E1 chamber results for the agreed configuration.

  • CARB Phase 2 / TSCA Title VI

    Formaldehyde documentation for applicable US orders.

  • AS 6669:2016

    Formwork plywood certification for Australian orders.

  • EUDR dossier

    GeoJSON plot data for EU orders.

All questions

Vietnam plywood sourcing questions and answers

How many pours can your film-faced plywood give?

About 12–15 pours with MUF glue and up to about 25 with phenolic glue, with proper handling, release agent on every pour and sealed edges.

Is film-faced plywood waterproof?

The film and a phenolic bond resist water; our 21 mm phenolic specimen passed EN 314 Class 3 after 72 h boiling. Bare edges let water in, so all edges are painted and site cuts must be sealed.

What is the difference between MUF and phenolic glue in your panels?

MUF is water-resistant and gives about 12–15 pours; phenolic is a WBP bond that gives up to about 25. Phenolic costs more and pays back on high-reuse jobs.

What MOQ, payment and delivery terms apply?

One 40HC; 30% deposit, 70% against the scanned B/L by T/T or L/C at sight; FOB Hai Phong, CFR or CIF.

Which anti-slip patterns do you make?

Rice, hexagon and wire-mesh. Two specimens pendulum-tested by SGS gave 58 dry / 40 wet and 60 dry / 53 wet; we claim no slip class from them.

How long is sea transit from Hai Phong to Northern Europe?

About 30–40 days, depending on carrier and route.

Which certificate files do you send before an order is confirmed?

The files for the agreed build: CE FPC certificate, FSC certificate, SGS test reports, and CARB P2 / TSCA, AS 6669 or EUDR files where the market needs them.

How long does production take?

15–45 days after the 30% deposit, depending on quantity, production conditions and what we agree.

Can I get samples before ordering?

Yes, free. New buyers book their own courier, and the courier cost can be credited against a real order.

Which sheet sizes and thicknesses do you make?

1220 × 2440 mm and 1250 × 2500 mm, 9–40 mm thick; 12, 15, 18 and 21 mm are the everyday formwork sizes.

Are you a trading company?

No. We are the manufacturer: two mills of our own in Chi Linh, Hai Phong, Vietnam, shipping up to 150 containers a month.

Can one container carry several products?

Usually one or two products; three to six can be mixed by agreement.

Quotation

Send your specification

Ask the question we have not answered, or send your specification. We reply with a technical sheet and a price.