Order process
Our steps from enquiry to loading.
Our order processTerms of supply · from the mill
In short
PK Ply supplies from one 40HC. The order is ready 15–45 days after the 30% deposit, depending on quantity and production conditions; the 70% balance is paid against the scanned B/L by T/T or irrevocable L/C at sight. We quote FOB Hai Phong, CFR or CIF, and new buyers get free samples.

Film
The film walks through one order: the technical sheet and price, the deposit, production, loading, the draft documents and the balance against the B/L.
The short answer
One 40HC. That is about 47 m³ of Acacia-core or about 43 m³ of Eucalyptus-core panels. The rest of the terms follow below in one table.
| Term | What applies |
|---|---|
| Minimum order | One 40HC |
| Products per container | Usually one or two; three to six by agreement |
| Production time | 15–45 days after the 30% deposit, by quantity, production conditions and agreement |
| Deposit | 30% by T/T |
| Balance | 70% against the scanned B/L, by T/T or irrevocable L/C at sight |
| Delivery terms | FOB Hai Phong, CFR or CIF |
| Samples | Free; new buyers book their own courier |
One 40HC
A container usually carries one or two products; three to six can be mixed by agreement. For 18 mm film-faced sheets, the planning figures are below.
| Size and core | Sheets | Volume | Weight per sheet |
|---|---|---|---|
| 1220 × 2440 mm, Acacia | 880 sheets (16 × 55) | 47.2 m³ | 31.1 kg |
| 1220 × 2440 mm, Eucalyptus | 795 sheets (15 × 53) | 42.6 m³ | 34.8 kg |
| 1250 × 2500 mm, Acacia | 848 sheets (16 × 53) | 47.7 m³ | 32.6 kg |
| 1250 × 2500 mm, Eucalyptus | 750 sheets (15 × 50) | 42.2 m³ | 36.6 kg |
Planning figures from our packing model, panels only; real sheets are weighed before final loading.
Payment
The balance is paid against the scanned bill of lading, after the goods are loaded and on the vessel. You pay the larger part only once the container has left Hai Phong under your name.
Production starts on the 30% deposit. After loading we send draft shipping documents for your approval, then the scanned B/L; the balance goes by T/T or by irrevocable L/C at sight.
Before any first payment, confirm our bank details by phone with the person you deal with. Never act on bank details that arrive changed by email.

Incoterms
FOB Hai Phong, CFR or CIF. Under all three, risk passes to you when the goods are on board the vessel at Hai Phong; the terms differ in who pays freight and insurance.
| Term | We arrange | You arrange | Risk passes |
|---|---|---|---|
| FOB Hai Phong | Export clearance and loading on board | Freight, insurance, import | On board at Hai Phong |
| CFR | As FOB, plus freight to your port | Insurance, import | On board at Hai Phong |
| CIF | As CFR, plus cargo insurance | Import | On board at Hai Phong |
Transit
Typical days at sea from Hai Phong range from 5–12 days to South-East Asia to 35–50 days to West Africa. The carrier and the route set the final figure.
| Region | Days at sea |
|---|---|
| South-East Asia | 5–12 days |
| Middle East | 15–25 days |
| US West Coast | 20–30 days |
| Mediterranean | 25–35 days |
| Northern Europe | 30–40 days |
| US East Coast | 35–45 days |
| West Africa | 35–50 days |
Documents
The certificate files for the agreed build come before you confirm the order; the shipping documents come in draft after loading.
Before confirmation
CE and FPC certificate, FSC certificate and claim terms, emission certificate, test reports for the agreed configuration.
EU orders
The EUTR/EUDR file set with GeoJSON plot data.
After loading, as drafts
Commercial invoice, packing list, B/L, certificate of origin (EUR.1 for EU lots), phytosanitary and fumigation papers.
Under CIF
The insurance certificate.
Samples and quotes
Yes. New buyers receive free samples and book their own courier; the courier cost can be credited against a real order. Repeat buyers and buyers with an order get samples free.
A quote starts from the job and the reuse target, then fixes core, glue, film weight, thickness, size, edge sealing and tolerance on a technical sheet. Two offers with the same name are often not the same build, so compare the sheets, not the names.
We publish no price list. Each quote names its delivery term and is built for the specification you send.
Buyer questions
One 40HC, about 47 m³ of Acacia-core or about 43 m³ of Eucalyptus-core panels.
Usually one or two; three to six can be mixed by agreement.
15–45 days, depending on quantity, production conditions and what we agree.
Against the scanned B/L, after loading, by T/T or irrevocable L/C at sight.
FOB Hai Phong, CFR or CIF; risk passes on board the vessel at Hai Phong under all three.
Yes. New buyers book their own courier, and the courier cost can be credited against a real order.
The certificate files for the agreed build: CE and FPC, FSC, emission certificate and test reports, plus the EUTR/EUDR file for EU orders.
No. Each quote is built on a technical sheet for your specification and names its delivery term.
Quotation
Send the panel, quantity and port of discharge. We reply with a technical sheet and a price FOB Hai Phong, CFR or CIF.